We are using cookies to implement functions like login, shopping cart or language selection for this website. Furthermore we use Google Analytics to create anonymized statistical reports of the usage which creates Cookies too. You will find more information in our privacy policy.
OK, I agree I do not want Google Analytics-Cookies
The International Journal of Oral & Maxillofacial Implants
Login:
username:

password:

Plattform:

Forgotten password?

Registration

Int J Oral Maxillofac Implants 15 (2000), No. 6     15. Dec. 2000
Int J Oral Maxillofac Implants 15 (2000), No. 6  (15.12.2000)

Page 883-888


Simultaneous Implant Placement and Vertical Ridge Augmentation with a Titanium-Reinforced Membrane: A Case Report
Cornelini, Roberto / Cangini, Filippo / Covani, Ugo / Andreana, Sebastiano
The present report demonstrates a clinical approach to achieve vertical ridge augmentation around endosseous implants. Two implants were placed, leaving the threads exposed, in the atrophic mandibular right posterior quadrant of a male patient. Both implants were covered with a titanium-reinforced expanded polytetrafluoroethylene (e-PTFE) membrane. Second-stage surgery was performed 12 months after implant placement. Upon membrane removal, growth of mineralized tissue was observed around both implants, covering areas previously not covered by bone. Implants were then progressively loaded and restored. Titanium-reinforced e-PTFE membranes can be satisfactorily used for vertical augmentation of atrophic ridges.

Keywords: alveolar ridge augmentation, dental implant, guided bone regeneration